ES / EN
flash
Nuevo catálogo Pequinsa Construcción
35 años aportando técnicas químicas de vanguardia
Piso Seguro
Vipeq
Realizacion obras
Memoria de Sostenibilidad

works carried out

09/06/2009
AKI Centre
AKI Centre

Flooring treatment at AKI Centre, located at the mall C.C. Garbera (San Sebastian, Basque Country).

08/06/2009
La Maquinista Mall and Vilamarina Mall
La Maquinista Mall and Vilamarina Mall

La Maquinista Mall (Barcelona) and Vilamarina Mall (Viladecans). Anti-slipping treatment, measurements and certification as set forth in ISO/DIS 10545-17 TORTUS tests and UNE-ENV 12633:03 PENDULUM. It was carried out by our technical applicators who measured BEFORE, DURING and AT THE END of the treatment, to have a confirmation of the right homogeneous application of the product.

07/06/2009
Vilamarina Mall (Viladecans)
Vilamarina Mall (Viladecans)

Anti-slipping treatment, measurements and certification as set forth in ISO/DIS 10545-17 TORTUS tests and UNE-ENV 12633:03 PENDULUM. It was carried out by our technical applicators who measured BEFORE, DURING and AT THE END of the treatment, to have a confirmation of the right homogeneous application of the product.

Soluciones a problemas en cerámica, mármol, piedra y granito
Ceramicas
Colabora
Ahorro  eficiencia
Construccion rehabilitacion
Moderna
Legal warning and privacy policy      © 2009 Pequinsa      Polígono Morea Norte C/ D nº 14 · Beriain (Navarra) · Tel +34 948 310 760 · Fax +34 948 312 413 · info@quimica-pequinsa.com

Esta empresa ha recibido una ayuda cofinanciada al 50% por el Fondo Europeo de Desarrollo Regional a través del Programa Operativo FEDER 2014-2020 de Navarra.